Client: Murphy Pipelines
Provided self drive and operated plant, additionally supplied client with peat turf buckets and bogs mats, lay down areas and site accommodation.
Murphy Pipelines was commissioned to construct a condensate pipeline for Total and BP, between the Shetland Gas Plant and the Sullom Voe oil terminal.
EMN Plant provided self drive and operated plant, including low ground pressure excavators which were necessitated by the nature of the terrain.